Skip to content

[Spec 1940] Post-merge porch state and thread - #1979

Merged
waleedkadous merged 8 commits into
mainfrom
builder/spir-1940
Nov 25, 2026
Merged

waleedkadous merged 8 commits into
mainfrom
builder/spir-1940

Conversation

@waleedkadous

Copy link
Copy Markdown
Contributor

Summary

Post-merge records for project 1940 (stage 1 of Tower-to-Tower messaging), which merged in PR #1957 (707e0e904). Follows the precedent of PR #1822 (post-merge porch state and thread for Spec 1819).

This changes two files and nothing else: no code, no tests, no docs.

  • codev/projects/1940-tower-to-tower-messaging-proto/status.yaml: porch's records made after the merge (PR merged, the verify-approval gate requested and approved, protocol complete). The copy on main stops at the pr gate approval; with this, main shows the project as verified.
  • codev/state/spir-1940_thread.md: two entries written after the merge, the merge itself and the verify-phase check on the installed Tower.

Out of verify

The read-only check on the installed Tower found that afx workspace list marks a workspace as running whenever Tower's terminal map has an entry for it, including the empty entries Tower creates for a workspace it is merely asked about. That is issue #1978, taken by a separate bugfix; nothing here changes it.

Refs #1940

Testing

None needed: a status file and a log. The branch merges cleanly into main.

@waleedkadous
waleedkadous merged commit 90d3721 into main Nov 25, 2026
8 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant