Repository navigation
[Spec 1963] Post-merge porch state and thread - #1981
Merged
Merged
Conversation
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Summary
Post-merge records for project 1963 (Codev Cockpit), which merged in PR #1971 (
84553614f). Follows the precedent of PR #1979 (post-merge porch state and thread for Spec 1940).This changes two files and nothing else: no code, no tests, no docs.
codev/projects/1963-vscode-alternative-layout-seco/status.yaml: porch's records made after the merge: the verify phase, PR [Spec 1963] VS Code alternative layout: Codev Cockpit #1971 recorded and merged, theverify-approvalgate requested and approved, protocol complete. The copy onmainstops at theprgate approval; with this,mainshows the project as verified.codev/state/spir-1963_thread.md: one entry written after the merge, covering the merge itself (the moved head, the branch-protection stop, the admin merge) and the verify phase.Refs #1963
Testing
None needed: a status file and a log.
origin/mainis merged into the branch, sogit diff origin/main builder/spir-1963is exactly these two files.