Repository navigation
release(v1.30.0): ship complete desktop at-rest encryption authority and verify migration/recovery #926
Description
CURRENT HARD PRE-TAG PUBLICATION BLOCK — 2026-10-09 (supersedes older fallback wording)
RELEASE = v1.30.0 / NOT ADMITTED
NEXT_V_STAR_TAG_ALLOWED = NO until #911 / QNB-162 mechanical publish gate is implemented, tested and TERMINAL
TAURI_GITHUB_RELEASE_PUBLICATION = BLOCKED pending fresh successful exact-tag OSV gate
GHCR_VERSION_MINOR_LATEST_PUSH = BLOCKED pending fresh successful exact-tag OSV gate
PROCEDURAL_CANCEL_OR_WATCH_SUBSTITUTION = NOT ACCEPTED for next release
R15_GATES_4D_4E_5_6_7 = RETAIN existing sequence/maintainer approval
GitHub #911 / Linear QNB-162 is an unconditional release-tag prerequisite, not simply a preferred improvement: no next release tag, Tauri/GitHub Release, GHCR version/minor/latest push, updater metadata publication or cutover-related release publishing until the independent per-workflow tag-SHA OSV security dependencies and negative/positive tests are proven. Old #926 wording allowing a maintainer-approved procedural watch was temporary for v1.29.1 and is not valid for the next tag. A mere healthy candidate or separate ci.yml Security Audit does not close #911. Gate 4D must not be preempted to implement this; schedule after Gate 6 and before the candidate/tag boundary, with #911 terminal before any tag. Preserve explicit Gate-7 authority and all other Release prerequisites. When #911 closes, the release owner independently re-reads workflow DAG, both failure-path proofs, issue/Linear relations, and exact resulting-main CI/CodeQL/Production/retention evidence before lifting this gate.
CURRENT CONTROL-PLANE CHECKPOINT — 2026-10-06 — v1.30 RELEASE OWNER GATED
CURRENT_MAIN = bf745090f7e980e167b1bbf01c7f6dea51fb451f
RESULTING_MAIN_CI_CD = 37434052556 / SUCCESS
RESULTING_MAIN_CODEQL = 37434052501 / SUCCESS
VERCEL_PRODUCTION = dpl_75HQcQhuYP6CxX43EjMov8Sjosdb / READY / exact CURRENT_MAIN / canonical HTTP 200
OPEN_PULL_REQUESTS = 0
DEPENDENCY_TRAIN = TERMINAL
FINAL_RETENTION = TERMINAL
ACTIVE_LANE = Gate 4D / #359 / QNB-11 — fresh read-only R4 admission
B2A = TERMINAL
B2 = NOT TERMINAL
RELEASE_EXECUTION_ALLOWED = NO
REQUIRED_SEQUENCE = complete Gate 4 → Gate 5 → Gate 6 → #948/QNB-182 → explicit Gate 7 → #932/QNB-176 + security/release truth gates → publication/verification
PRODUCTION_AUTHORITY_SWITCH_ALLOWED = NO
The release train has returned from dependency/retention housekeeping to the semantic R-15 critical path. No tag or release publication is admitted yet.
HISTORICAL / SUPERSEDED CONTROL-PLANE CHECKPOINT — 2026-10-04 — SUCCESSOR B / PR #954 ACTIVE
CURRENT_MAIN = 2001e63f3b7b1fbf2faa0270238f0de43ba84db1
PR_953 = MERGED / Successor A read-snapshot slice landed
PR_954 = OPEN / DRAFT / MERGEABLE
PR_954_HEAD = 93384b5a71f8bed4f2cde1428b762d2db0b13790
PR_954_BASE = 2001e63f3b7b1fbf2faa0270238f0de43ba84db1
PR_954_SCOPE = Successor B — Mutation / Root-Recovery / Lifecycle Closure
PR_954_SIZE = 16 files / 2 commits / +2121 -100
CODEANT = Quality / Coverage / SCR / SAST / SCA SUCCESS exact head
CODERABBIT = status SUCCESS, but Draft PR auto-review is disabled; do not call review clean
DEEPSOURCE = Python / Shell / Docker SUCCESS; review grade A; Rust status not inferred
VERCEL_PREVIEW = dpl_2JuoEypL2STM2hXvq9ESVa1Gmz9N BUILDING exact head
CI_CD = IN PROGRESS / not yet terminally proven here
CODEQL = not yet terminally proven here
REVIEWS = no submitted reviewer epoch yet
UNRESOLVED_REVIEW_THREADS = 0 at this checkpoint
PR_952 = OPEN / DRAFT / FROZEN PROVENANCE — DO NOT MERGE
GATE_4B = ACTIVE
4C / 4D / 4E = PENDING
PRODUCTION_AUTHORITY_SWITCH_ALLOWED = NO
Successor B is correctly based on the #953 resulting main and carries the semantic A+B union: #953 SessionBinding/rebind semantics plus the mutation/root-recovery/lifecycle mechanisms extracted from frozen #952. The prepared-root Step-F same-instance recovery R1–R5 proof remains this PR's material closure scope.
Do not close Gate 4B, #922, #445, or advance #359/4D until #954 converges on its exact final head, merges normally, and the exact resulting-main CI/CD + CodeQL + Vercel Production gate is terminal.
HISTORICAL / SUPERSEDED — Successor A exact-head checkpoint — PR #953 — 2026-10-03
PR = #953
HEAD = e9bd7556ab0f8111f843b78038fa56078792a097
BASE = 3cd2b6a37ab8b5bbe8abe32830cd8170b0c9d052
FILES = 15
COMMITS = 3 signed
MEANINGFUL_LINES = 1870
PR_952 = OPEN / DRAFT / frozen provenance
CODEQL = SUCCESS
CHANGELOG/TEXT GUARDS = SUCCESS
CODEANT = all gates SUCCESS
CI_CD = IN_PROGRESS; all Rust/Node/platform/signature/security/build jobs green, E2E/VRT downstream still running
VERCEL = SUCCESS exact head
CODEX_EXACT_HEAD = one new P2 race remains open
MERGE_READY = NO
PRODUCTION_AUTHORITY_SWITCH_ALLOWED = NO
The Terra/Codex closure commit e9bd7556... is now on the remote despite the executor's final report having observed a delayed remote ref. The earlier transport blocker is therefore RESOLVED / transient.
The three P2s from 12cf7833... are implemented and their threads are now resolved:
- steady-state validated same-key external forward rebind;
- lifetime-contract cross-process barrier wording;
- admitted snapshot-backed catalog enumeration with raw production list/load paths gated away.
Fresh exact-head Codex review on e9bd7556... found one additional VALID same-slice blocker: a mid-capture TOCTOU can occur when provider.state() observes the old runtime as Unlocked, another process commits root N+1, then the subsequent anchor read sees N+1. Current code publishes N+1 into AuthorityCell.current before proving the provider is bound to N+1; resolve_ref then returns Locked, and future retry cannot take the strict-forward rebind path because N+1 has already poisoned current.
Required invariant for closure: never publish a newer snapshot into current before provider/key usability for that exact anchor is established. Prefer rebinding/validation before publication, or otherwise restore/retain the previous snapshot on resolution failure. Preserve explicit-lock, route-change/rotation, rollback, same-generation mismatch and incompatible-authority refusals.
This is still Read/Snapshot scope, but anti-cascade remains binding. One surgical race fix with a deterministic mid-capture regression is admissible; if it needs broad provider redesign or another architectural expansion, stop/split rather than cascade.
The new CodeScene Large Method warning on the 134-line cross-process integration test is non-material and resolved by evidence; no suppression or proof weakening.
Resource horizon remains unchanged: after #953 protected merge + exact resulting-main CI/CD/CodeQL/Vercel Production + cleanup/retention, executor reports and STOPs. No successor B or 4C.
CURRENT EXECUTION MODE — 2026-10-03 — RESOURCE-BOUNDED GATE 4B SPLIT
CURRENT_MAIN = 3cd2b6a37ab8b5bbe8abe32830cd8170b0c9d052
PR_952 = OPEN / DRAFT / FROZEN PROVENANCE
PR_952_HEAD = e34aae28bba31269a814a9a2778346e568c3577e
PR_952_BUDGET = 16 files / 3000 meaningful lines / 5 signed commits
PR_952_MERGE = FORBIDDEN — validated prepared-root recovery gap remains
GATE_4B_SPLIT = ADMITTED
SUCCESSOR_A = Read/Snapshot Admission Closure
SUCCESSOR_B = Mutation/Root-Recovery/Lifecycle Closure
CURRENT_AGENT_HORIZON = SUCCESSOR_A ONLY → merge → exact resulting-main proof → cleanup/retention → STOP
CONTROL_PLANE_WRITES = ChatGPT session only; coding agent read-only except successor-PR operations
4C = PENDING
4D = PENDING via WorldScript-Studio#359 / QNB-11
4E = PENDING
RELEASE_READY = NO
PRODUCTION_AUTHORITY_SWITCH_ALLOWED = NO
Anti-cascade/resource decision: PR #952 is no longer a correction target. It is the immutable reviewed extraction source. The current coding-agent run is deliberately bounded to the first successor PR only and must stop after its normal protected merge, exact resulting-main CI/CD + CodeQL + Vercel Production verification, worktree/branch cleanup, and safe Vercel retention. It must not start successor B or 4C in the same execution epoch.
Control-plane ownership is also split deliberately: GitHub issue, Linear, milestone, release-program and checkpoint curation is performed from the ChatGPT control-plane session; the coding agent should only read those records when needed and should not spend token/week quota duplicating status maintenance.
The prepared-root Step-F coordinator-recovery Critical is Gate 4B successor-B scope, not Gate 4D. Gate 4D remains crash-resumable rotation/rekey after 4B and 4C. #360/QNB-12 remains open until complete Gate 4B closure.
CURRENT R-15 CHECKPOINT — PR 952 / e34aae2 — recovery finding blocks merge
CURRENT_MAIN = 3cd2b6a37ab8b5bbe8abe32830cd8170b0c9d052
4A = TERMINAL via 950
4B_FOUNDATION = TERMINAL via 951
4B_INTEGRATION = ACTIVE / PR 952
PR_952_HEAD = e34aae28bba31269a814a9a2778346e568c3577e
PR_BUDGET = 16 files / 3000 meaningful lines / 5 signed commits
CODEQL = 37132489430 SUCCESS
CI_CD = 37132489420 SUCCESS — all required exact-head jobs terminal green
VERCEL_PREVIEW = dpl_FBpTZftnpnum9ZahLkPCeMfAWUtz READY exact head
CODEX = exact e34aae28 review reports no major issue
CODERABBIT = current incremental review 401b81b8 to e34aae28 complete / no actionable finding
CODEANT_QUALITY_SCR = FAILURE — valid material recovery finding is not dismissed
CODEANT = fresh full review completed; validated prepared-root recovery gap remains OPEN
MERGE_READY = NO
GH_360 = OPEN / QNB-12 In Progress
GATE_4 = ACTIVE / QNB-168 In Progress / M3 Active
4C = PENDING
4D = PENDING via 359 / QNB-11
4E = PENDING
RELEASE_READY = NO
PRODUCTION_AUTHORITY_SWITCH_ALLOWED = NO
The minimal stale-CAS correction is signed/pushed and locally verified: success and reconciled stale CAS clear the local mutation latch only after physical/writer/admission revalidation; all uncertain errors remain fail-closed. Normal Git transport works; no sandbox/protection/signing bypass occurred.
New material finding: after an injected step-F COMMIT failure, the public coordinator reconciliation returns PreparationPending even when the provider fault is removed. Existing authenticated recover_root is not integrated into the provider-owning coordinator operation API. Lock/shutdown correctly refuse, but same-instance recovery is incomplete. Diagnostic proof is retained locally; temporary probes were removed from source. Do not merge or close 360/QNB-12 until this is fixed with fault proof and fresh exact-head convergence.
No-op RootBusy is separately proved retryable after contention release; its conservative latch is not the prepared-root recovery defect. Remaining DeepSource Rust / CodeScene reds are understood test-only advisory findings, not green. No 4C journal, 4D rekey, collector, deletion, current-app authority change or Gate-7 switch was introduced. At saturated budget, establish a bounded mutation/root-recovery/lifecycle proof slice rather than expand or delete meaningful safety evidence.
HISTORICAL / SUPERSEDED — prior Gate-4B foundation checkpoint
CURRENT R-15 CHECKPOINT — 2026-10-03 — GATE 4B FOUNDATION TERMINAL VIA #951
CURRENT_MAIN = 3cd2b6a37ab8b5bbe8abe32830cd8170b0c9d052
RESULTING_MAIN_VERIFICATION = TERMINAL
4A = TERMINAL via #950
4B_FOUNDATION = TERMINAL via #951
PR_951_FINAL_HEAD = d3c87fe675300b2d29e797625b192516a94fd191
PR_951_MERGED_AT = 2026-10-03T04:51:40Z
RESULTING_MAIN_CI_CD = 37097936085 SUCCESS
RESULTING_MAIN_CODEQL = 37097936105 SUCCESS
VERCEL_PRODUCTION = dpl_9W7p2XZ4dscci5d2sXasPHK7iibz READY / PROMOTED exact CURRENT_MAIN / HTTP 200
HOUSEKEEPING = COMPLETE — clean local main; merged branch/tracking ref removed; other worktrees preserved
RETENTION = COMPLETE — 3 stale predecessor previews deleted; all 15 protected IDs and alias bindings verified
4B_OVERALL = ACTIVE / #360 / QNB-12
4B_INTEGRATION = NEXT — protected operation / authority-key / snapshot / lifecycle integration
GH_360 = OPEN until complete 4B acceptance
4C = PENDING / authenticated journal + paged manifest
4D = PENDING / #359 / QNB-11 / rekey + key-epoch crash window
4E = PENDING / first enable + disable refusal + Gate 4 closure
GATE_4 = ACTIVE
RELEASE_READY = NO
PRODUCTION_AUTHORITY_SWITCH_ALLOWED = NO
All resulting-main CI/CD jobs succeeded, including Security Audit, Verified Signatures, Node 22/24, Core/Tauri Rust, Linux/macOS/Windows platform evidence, Build, Playwright, Deep Coverage, Storybook, Browser Quality, CI Success and Pages. Final-head CodeRabbit/CodeAnt/Codex review converged with no actionable finding and no unresolved thread. The two DeepSource test false positives remain evidence-dispositioned advisory red, not green; unavailable reviewer quotas remain recorded.
This terminal checkpoint is for the kernel admission foundation only. It does not complete issue 360, Gate 4B overall, Gate 4 or production Core authority. The next bounded engineering owner remains 4B integration, not 4C.
HISTORICAL / SUPERSEDED — #951 merged, post-merge proof was pending
CURRENT_MAIN = 3cd2b6a37ab8b5bbe8abe32830cd8170b0c9d052
LAST_VERIFIED_MAIN = 4f33d7786076c1d00e73d5db9c527fbd1ea31693
4A = TERMINAL via #950
4B = ACTIVE / #360 / QNB-12
4B_FOUNDATION_PR = #951 MERGED at 2026-10-03T04:51:40Z
PR_951_FINAL_HEAD = d3c87fe675300b2d29e797625b192516a94fd191
4B_FOUNDATION_TERMINAL = NO — resulting-main + Production + housekeeping pending
RESULTING_MAIN_CI_CD = 37097936085 IN_PROGRESS
RESULTING_MAIN_CODEQL = 37097936105 IN_PROGRESS
VERCEL_PRODUCTION_EXACT_CURRENT_MAIN = PENDING VERIFICATION
GH_360 = OPEN until complete 4B integration acceptance
NEXT_ENGINEERING = 4B protected-operation integration, only after foundation terminal proof
4C = PENDING / journal + paged manifest
4D = PENDING / #359 / QNB-11 / rekey + key-epoch crash window
4E = PENDING / first enable + disable refusal + Gate 4 closure
GATE_4 = ACTIVE
RELEASE_READY = NO
PRODUCTION_AUTHORITY_SWITCH_ALLOWED = NO
Final-head CI/CD and CodeQL succeeded; CodeRabbit, CodeAnt and Codex reviewed the final delta/head without remaining actionable findings. All review threads are resolved. The two DeepSource test findings remain evidence-dispositioned advisory false positives, not a green status; quotas are recorded as unavailable. The normal protected squash merge did not close #360 or switch production Core authority. No next semantic slice or retention deletion starts before the exact resulting-main gate.
HISTORICAL / SUPERSEDED — pre-merge #951 checkpoint
CURRENT_MAIN = 4f33d7786076c1d00e73d5db9c527fbd1ea31693
GATE_3 = TERMINAL via #949
GATE_4 = ACTIVE via #922
4A = TERMINAL via #950
PR_950_FINAL_HEAD = f2dde0e65bb4dacfd6753f16a6bce1e28bf13078
RESULTING_MAIN_CI_CD = 36994420903 SUCCESS
RESULTING_MAIN_CODEQL = 36994420828 SUCCESS
VERCEL_PRODUCTION = dpl_7Z1r45ckAp4YeYpdHWtHdzQ8BWNN READY exact CURRENT_MAIN
4B = ACTIVE / #360 / QNB-12 / PR #951 kernel admission foundation; protected-operation integration follows
PR_951_HEAD = d3c87fe675300b2d29e797625b192516a94fd191
PR_951_STATUS = OPEN / exact-head CI and review pending / not terminal
GH_360 = OPEN until full 4B acceptance
4C = PENDING / journal + paged manifest
4D = PENDING / #359 / QNB-11 / rekey + key-epoch crash window
4E = PENDING / first enable + disable refusal + Gate 4 closure
NEXT = 4B → 4C → 4D → 4E → Gate 5 → Gate 6 → explicit Gate 7 authorization
PRE_GATE_7_RESIDUAL = #948
RELEASE_READY = NO
PRODUCTION_AUTHORITY_SWITCH_ALLOWED = NO
Live reconciliation confirms Gate 4A terminal, including exact resulting-main CI/CD, CodeQL and Production evidence. Gate 4B is the current renderer-neutral admission/fencing owner. Historical legacy filesystem defects remain provenance; this checkpoint does not claim a production authority switch or Gate 4 closure.
HISTORICAL / SUPERSEDED — CURRENT RELEASE PROGRAM CHECKPOINT — 2026-10-02 10:21 CEST — superseded by verified Gate 4A terminal checkpoint
- TARGET = v1.30.0
- M0 = TERMINAL
- M1 = TERMINAL
- M2 / GATE_3 = TERMINAL via feat(core): close R-15 Gate 3 with its evidence matrix and residual owners (#445) #949
- CURRENT_MAIN = 4f119e2
- RESULTING_MAIN_VERIFICATION = TERMINAL
- VERCEL_PRODUCTION = dpl_2r1QiNXDpGw1YdG52eUbuRc3p6fx READY exact CURRENT_MAIN
- M3 / GATE_4 = ACTIVE via security(core/R-15): Gate 4 — journal, admission, rekey/recovery and cross-process serialization #922 / PR feat(core): serialize every root commit through a cross-process root_commit_mutex (#445) #950
- PR_950_HEAD = 791d608
- NEXT = Gate 4 terminal → Gate 5 → Gate 6 → explicit Gate 7 authorization → Gate 7
- PRE_GATE_7_RESIDUAL = R-15: record deletion transitions (DELETE_PENDING / TOMBSTONED) in the protected write path #948
- PRE_RELEASE_DOC_GATE = docs(release): pre-v1.30 public-doc parity, DEV.to discoverability and bounded housekeeping checkpoint #932 / QNB-176 after Gate 7
- RELEASE_READY = NO
- PRODUCTION_AUTHORITY_SWITCH_ALLOWED = NO
The release-critical lane remains R-15. Do not pull the deferred Dependabot/governance/editorial train ahead of Gate 4 absent a fresh material security/data-loss/release blocker. #950 is in its initial exact-head epoch and is not yet merge-ready.
HISTORICAL / SUPERSEDED — CURRENT RELEASE PROGRAM CHECKPOINT — 2026-10-01 23:12 CEST — superseded 2026-10-02 10:21 CEST
TARGET = v1.30.0
M0 = TERMINAL
M1 = TERMINAL
M2 = ACTIVE — Gate 3 / #921 / QNB-167
CURRENT_MAIN = 03a24786f1c9fda76656dbbd2a635e324331ec81 (#941 resulting main)
RESULTING_MAIN_VERIFICATION = TERMINAL
CURRENT_MAIN_CI / CODEQL / SECURITY / SIGNATURES = SUCCESS
VERCEL_PRODUCTION = READY on exact CURRENT_MAIN
GATE_3A = TERMINAL via #930
GATE_3B = TERMINAL via #937 + #940
GATE_3C_PART_1 = TERMINAL via #941
GATE_3C_PART_2 = ACTIVE via #942 @ 48525c99ed20c88774df161b8d8c0d474a785302
NEXT = #942 terminal → 3C part 3 → Gate 3/#357 closure → Gate 4 → Gate 5 → Gate 6 → explicit Gate 7 authorization → Gate 7
PRE_RELEASE_DOC_TRUTH_GATE = #932 / QNB-176 after Gate 7
RELEASE_READY = NO
PRODUCTION_AUTHORITY_SWITCH_ALLOWED = NO
The release-critical lane remains R-15. #941 is terminal; #942 is active and not merge-ready at the latest readback. Do not pull Dependabot/governance/editorial work ahead of this lane absent a fresh material security/data-loss/release blocker. #911 remains a preferred pre-tag publication-security prerequisite, not a Gate 3–6 preemption.
HISTORICAL / SUPERSEDED — CURRENT RELEASE PROGRAM CHECKPOINT — 2026-10-01 — superseded 2026-10-01 23:12 CEST
TARGET = v1.30.0
M0 = TERMINAL
M1 = TERMINAL — Gate 2
M2 = ACTIVE — Gate 3 / #921
CURRENT_MAIN = e43559b9bd6c5a8b6f5ba06ed9a2da42079551e1 (#940 resulting main)
RESULTING_MAIN_VERIFICATION = TERMINAL
CURRENT_MAIN_CI / CODEQL / SECURITY / SIGNATURES = SUCCESS
VERCEL_PRODUCTION = READY on exact CURRENT_MAIN
GATE_3A = TERMINAL via #930
GATE_3B_PART_1 = TERMINAL via #937
GATE_3B_PART_2 = TERMINAL via #940
GATE_3C_PART_1 = ACTIVE via #941, head 7a1edcf1527947e7b75cc8e8c6fbe6e1ea11a701
NEXT = #941 terminal → 3C part 2 → 3C part 3 / #357 reconciliation → Gate 4 → Gate 5 → Gate 6 → explicit Gate 7 approval → Gate 7
PRE_RELEASE_DOC_TRUTH_GATE = #932 / QNB-176 after Gate 7 and before candidate/tag freeze
RELEASE_READY = NO
PRODUCTION_AUTHORITY_SWITCH_ALLOWED = NO
The release-critical lane remains R-15. Gate 3B is now terminal; do not describe #936/#937/#940 as active prerequisites. Current execution is Gate 3C through #941. #941 remains in exact-head convergence and is not merge-ready at the latest readback because current reviewer findings still need correction/disposition and Node 22/24 are still running.
Primary execution sequence — current
- TERMINAL — dependency-security blocker security(deps): raise axios and DOMPurify floors after fresh OSV gate failure #918/fix(deps): raise the axios and DOMPurify override floors (fresh OSV findings, #918) #919.
- TERMINAL — Gate 2 via feat(core): add the Gate 2 typed record-identity registry (#445) #917/feat(core): add the Gate 2 identity-bound record codec (#445) #928/feat(core): close Gate 2 with the §10.4.1 record-class disposition (#445) #929.
- TERMINAL — Gate 3A via feat(core): add Gate 3 slice 3A durable staging and promotion (#445) #930.
- TERMINAL — ci(docs-truth): machine-check R-15 gate status agreement between the contract and the Core Migration Ledger #933/ci(docs-truth): machine-check R-15 gate status across the contract and the ledger (#933) #934 and R-15 gate status guard: strict canonical-block grammar and fuller prose parsing (follow-up to #933) #935/fix(docs-truth): strict R-15 status block grammar and fuller prose parsing (#935) #936 docs-truth support.
- TERMINAL — Gate 3B via feat(core): add the Gate 3 slice 3B record-commit marker codec (#445) #937 + feat(core): add the Gate 3 slice 3B commit protocol and startup reconciliation (#445) #940; resulting main
e43559b9...fully proven. - ACTIVE — Gate 3C part 1 via feat(core): add the Gate 3 slice 3C authority-root digests (#445) #941.
- NEXT — 3C parts 2/3 and Desktop atomic writes: fsync temp file + parent directory before/after rename for true crash durability #357 reconciliation; then Gate 3 terminal.
- Gate 4 security(core/R-15): Gate 4 — journal, admission, rekey/recovery and cross-process serialization #922 → Gate 5 security(core/R-15): Gate 5 — fence every protected writer and complete inventory/migration readiness #923 → Gate 6 security(core/R-15): Gate 6 — packaged shadow/compatibility qualification on Linux, Windows and macOS #924.
- Explicit maintainer authorization checkpoint for Gate 7.
- Gate 7 security(core/R-15): Gate 7 — explicit production authority switch, legacy migration and cutover #925.
- docs(release): pre-v1.30 public-doc parity, DEV.to discoverability and bounded housekeeping checkpoint #932 pre-release source/public-truth checkpoint.
- Freeze exact candidate and execute v1.30.0 qualification/publication through this owner.
HISTORICAL / SUPERSEDED — release checkpoint before Gate 3B completion — 2026-10-01
TARGET = v1.30.0
M0 = TERMINAL
M1 = TERMINAL — Gate 2
M2 = ACTIVE — Gate 3 (#921)
M2_3A = TERMINAL via #930
CURRENT_MAIN = cd12c1041fc5e6e7197484bd81c88597f6974fa6 (#936 resulting main)
#933/#934 = TERMINAL
#935/#936 = MERGED
RESULTING_MAIN_VERIFICATION = IN PROGRESS
CODEQL / SECURITY / SIGNATURES = SUCCESS
VERCEL_PRODUCTION = READY on exact CURRENT_MAIN
NODE_22 / NODE_24 = RUNNING at latest readback
NEXT = resulting-main terminal proof → Gate 3B → 3C → Gate 4 → Gate 5 → Gate 6 → explicit Gate 7 approval → Gate 7
PRE_RELEASE_DOC_TRUTH_GATE = #932 / QNB-176 after Gate 7, before release freeze
RELEASE_READY = NO
PRODUCTION_AUTHORITY_SWITCH_ALLOWED = NO
The active release-critical lane remains R-15. #935/#936 is merged support history now, not an active release-preparation lane. Complete exact-SHA resulting-main proof and continue directly to Gate 3B.
Pre-release documentation/housekeeping gate — #932
After Gate 7 / #925 is merged and its resulting-main authority state is proven, but before candidate/tag freeze, complete #932:
#925 Gate 7 resulting-main proof
→ #932 README/GitBook/DeepWiki/DEV.to + bounded docs housekeeping
→ resulting-main proof
→ release freeze/tag/publish
#932 is a release-truth checkpoint, not a broad housekeeping detour. #877/#927 remain the larger post-release cleanup/reset owners.
In particular, do not change current README desktop-at-rest-encryption claims before Gate 7 makes those claims stale.
Milestone mission
Make v1.30.0 the focused milestone release that completes and ships the renderer-neutral desktop at-rest encryption program owned by #445.
A minor-version bump from v1.29.1 to v1.30.0 is intentional: this is a substantial new production security/storage capability and migration boundary, not a patch-only correction.
MILESTONE = COMPLETE_DESKTOP_AT_REST_ENCRYPTION
TARGET_VERSION = 1.30.0
PRIMARY_PROGRAM = #445 / R-15
RELEASE_READY = NO
PRODUCTION_AUTHORITY_SWITCH_ALLOWED = NO until Gate 7 authorization
Primary execution sequence
- TERMINAL — dependency-security blocker security(deps): raise axios and DOMPurify floors after fresh OSV gate failure #918 / PR fix(deps): raise the axios and DOMPurify override floors (fresh OSV findings, #918) #919.
- TERMINAL — Gate 2 via feat(core): add the Gate 2 typed record-identity registry (#445) #917 → feat(core): add the Gate 2 identity-bound record codec (#445) #928 → feat(core): close Gate 2 with the §10.4.1 record-class disposition (#445) #929; security(core/R-15): Gate 2 — complete identity-bound adapters and AAD closure #920 closed.
- TERMINAL — Gate 3A via feat(core): add Gate 3 slice 3A durable staging and promotion (#445) #930.
- TERMINAL — ci(docs-truth): machine-check R-15 gate status agreement between the contract and the Core Migration Ledger #933 / PR ci(docs-truth): machine-check R-15 gate status across the contract and the ledger (#933) #934 deterministic R-15 gate-status truth guard; resulting main
c4240125...proven. - TERMINAL/MERGED — R-15 gate status guard: strict canonical-block grammar and fuller prose parsing (follow-up to #933) #935 / PR fix(docs-truth): strict R-15 status block grammar and fuller prose parsing (#935) #936 parser hardening; resulting-main verification is completing on
cd12c104.... - NEXT — Gate 3B, then 3C / Desktop atomic writes: fsync temp file + parent directory before/after rename for true crash durability #357 reconciliation.
- Gate 4 via security(core/R-15): Gate 4 — journal, admission, rekey/recovery and cross-process serialization #922 — journal/admission/rekey/recovery/cross-process serialization / Desktop fs-data key-rotation migration is not crash-resumable (mixed-key state possible) #359/Desktop fs reads/writes don't participate in the encryption-migration admission lock (race window during disable/rotate) #360.
- Gate 5 via security(core/R-15): Gate 5 — fence every protected writer and complete inventory/migration readiness #923 — all protected classes fenced + inventory-complete migration readiness.
- Gate 6 via security(core/R-15): Gate 6 — packaged shadow/compatibility qualification on Linux, Windows and macOS #924 — packaged shadow/compatibility qualification using test(native): automate packaged-state release qualification for built Tauri desktop artifacts #906.
- Explicit maintainer authorization checkpoint for Gate 7.
- Gate 7 via security(core/R-15): Gate 7 — explicit production authority switch, legacy migration and cutover #925 — production authority switch + preserve-first legacy migration; Bind desktop fs-backed ciphertext to its record identity (AAD) to prevent cross-file substitution #361 closes only with shipped-authority evidence.
- docs(release): pre-v1.30 public-doc parity, DEV.to discoverability and bounded housekeeping checkpoint #932 pre-release public/source-truth checkpoint.
- Freeze exact release candidate and execute release qualification/publication through this owner.
No unrelated roadmap expansion should preempt this lane unless a fresh P0/P1 security/data-loss/release blocker requires it.
Mandatory release prerequisites
Product/security
- security(core/R-15): renderer-neutral encrypted desktop storage, durable migration & identity binding #445 terminal production evidence;
- Desktop atomic writes: fsync temp file + parent directory before/after rename for true crash durability #357/Desktop fs-data key-rotation migration is not crash-resumable (mixed-key state possible) #359/Desktop fs reads/writes don't participate in the encryption-migration admission lock (race window during disable/rotate) #360/Bind desktop fs-backed ciphertext to its record identity (AAD) to prevent cross-file substitution #361 closed or bounded residuals explicitly reconciled;
- no unresolved P0/P1 on the at-rest cutover path;
- security(truth): consolidate user-visible security/privacy claims across storage, providers, PWA, collaboration & supply chain #549 security/privacy claims reconciled to shipped behavior;
- docs(authority): keep README.md, GitBook EN/DE and DeepWiki continuously accurate and source-truth aligned #724 source-truth docs updated only after evidence exists.
Packaging / qualification
- test(native): automate packaged-state release qualification for built Tauri desktop artifacts #906 exact-artifact packaged qualification includes at-rest migration/upgrade scenarios;
- Linux/Windows/macOS release artifacts from frozen candidate;
- v1.29.1 upgrade plus representative historical profile(s);
- fresh install;
- interrupted migration/restart;
- wrong key / unavailable keystore / corruption / substitution / recovery;
- no data loss and no plaintext-authority fallback.
Release pipeline
- release: make tag-time publishing depend on the security audit (Tauri release + GHCR) #911 / QNB-162 MUST be terminal before the next v tag*: exact tag-time OSV Security Audit is a hard mechanical dependency for Tauri/GitHub Release and all GHCR pushes/moving aliases; a procedural watch or manual cancellation does not satisfy this gate;
- exact candidate Security Audit, CI/CD and CodeQL green;
- updater/release metadata correct;
- GHCR semantic tags/aliases verified;
- signed tag; never move/reuse a failed tag.
Compliance / distribution
- preserve current notices/SBOM guarantees;
- release(native): establish platform code signing, notarization, artifact identity & rollback trust #574 OS-native signing/notarization stays separate; do not falsely block this release on an unclaimed capability, and do not overclaim signing/notarization.
Release execution
freeze exact candidate SHA
→ resulting-main CI/CD + CodeQL
→ fresh side-effect-free Security Audit
→ exact-SHA packaged builds
→ packaged at-rest qualification matrix
→ release-truth/docs final check
→ signed v1.30.0 tag
→ tag-time security gate
→ Tauri/GitHub Release + GHCR publication
→ verify assets/digests/updater metadata
→ verify canonical web/production health
→ verify upgrade path from v1.29.1
→ declare v1.30.0 VERIFIED
Terminal definition
Do not close on tag creation alone. v1.30.0 VERIFIED requires published desktop assets, correct GHCR state, verified signed tag, exact released commit, packaged migration/reopen proof, no stored-data regression, at-rest claims proven against real released artifacts, healthy post-release main and mirrored Linear evidence.
After terminal release
Immediately hand off to #927 for the dedicated post-v1.30 source-truth/audit/housekeeping reset, then resume the highest-priority non-R-15 roadmap work from a freshly audited control plane.
Activity
qnbs commentedon Sep 30, 2026
Linear control-plane mirror
GitHub remains the implementation/evidence source of truth; Linear tracks sequencing, priority, dependencies and milestone progress.
qnbs commentedon Oct 3, 2026
PR #953 final-head checkpoint —
3c118bc652210a5861fe408e9d89e4893a66a3a0.fix(core): make snapshot publication rebind atomic (#445)AuthorityCell.current; exact key usability and exact anchor equality are proven before publication; subsequent capture remains usable3c118bc6...still pendingqnbs commentedon Oct 4, 2026
PR #953 continuation authorization — 2026-10-04.
Fresh Codex exact-head review on
3c118bc652210a5861fe408e9d89e4893a66a3a0produced three VALID Read/Rebind P2s:KeyState::Lockedcannot distinguish explicit lock from a stale previously-unlocked session, so same-key forward auto-rebind can violate explicit-lock refusal;current=Noneprovides no baseline, so a stale previously-unlocked runtime cannot rebind after an external same-key advance.NEW EXECUTION POLICY: these findings are explicitly authorized for further correction on #953. Do NOT stop merely because another fixable same-slice P2 appears. Continue correction → local proof → signed push → fresh exact-head review/CI cycles until #953 genuinely converges and can be merged normally. Only an unfixable platform/auth/protection blocker or a scope change into Successor-B mutation/root-recovery/4C may stop execution.
Preferred common design direction: preserve a non-secret provider session-binding witness (scope + committed root, or equivalent) that survives stale-root detection but is cleared by explicit lock. Use it to distinguish explicit lock from stale binding and to establish a safe pre-first-capture baseline. Prepared-root-only changes must not be treated as read-authority changes; compare/revalidate the committed read-authority projection rather than the whole AnchorState where appropriate.
#360 / QNB-12 remain open. Successor B remains mutation/root-recovery/lifecycle. PRODUCTION_AUTHORITY_SWITCH_ALLOWED = NO.
qnbs commentedon Oct 14, 2026
2026-10-14 ~10:15 UTC — maintainer-prioritized bounded Dependabot integration train AFTER #1041 + #1042 (release-first)
Maintainer direction: all Dependabot PRs already open and newly arriving during the waiting period must be inventoried and disposed of promptly immediately after (a) GitHub Pages #1028/PR #1041 is safety-approved, merged and its first real pruning pass verified, and (b) separately owned #1042 has completed every provably safe Vercel-generated GitHub deployment metadata cleanup and documented protected/unknown residuals. Then execute this bounded dependency train, verify resulting main/Production/retention and return immediately to R-15 Gate4 W1. Read-only Dependabot triage is allowed in parallel while waiting. A technically unsafe unremovable old GitHub deployment record must be preserved/documented, not allowed to stall Gate4 or the train forever.
Live authenticated intake baseline (re-fetch before acting)
Protected
main=be3c875fac33bfdd628dce9c70c1fb0e42ac672d; 11 Dependabot PRs now OPEN/RFR:tauri-deps13-version group, includes prohibitedtauri-plugin-updater 2.13.1(reposrc-tauri/Cargo.tomlexplicitly caps~2.12.0for Rust 1.77.2/MSRV; upstream 2.13 requires Rust 1.90), both Node Quality Gate failures and CI Success failed; Tauri Cargo/npm cross-surface parity must be established by actualpnpm run tauri-plugins:check, not bypassed. NOT MERGEABLE unchanged.tokio 1.53.1 → 1.53.2Tauri lockfile-only: PATCH, evaluate normal gates.base64ct 1.6.0 → 1.8.3Core:crates/worldscript-secure-storage/Cargo.tomlexplicitly documents 1.7+ requires Rust ≥1.81 vs 1.77.2 secure-store MSRV; Ubuntu Secure Store Platform Evidence FAIL. HOLD pending verified compatible alternative or formally separately admitted MSRV migration, never silently weaken 1.77.2 gate.windows-sys 0.52.0 → 0.61.2: major crate-version change, require explicit Windows API/feature + MSRV review, real 3OS Secure Store and platform acceptance before merge; green partial CI insufficient.dbus-secret-service 4.0.3 → 4.1.0: upstream minimum Rust 1.78 vs repo 1.77.2; Ubuntu Secure Store Platform Evidence FAIL. HOLD pending demonstrated compatible alternative or separately admitted MSRV migration.setup-node 6.5.0→7.1.0: requires immutable SHA pin/auth review; observed Reviewer Governance Trust Boundary FAIL and Core Rust Gate FAIL. Do not hide red by bundling.upload-artifact 7.0.1→7.0.2, same upstream references updated together.download-artifact 8.0.1→8.0.2, group with other compatible Actions only if that reduces proven integration risk.plugin-shell 2.3.6→2.4.0across both package manifests and pnpm lockfile;plugin-notification 2.4.0→2.5.1; both must honor independent Rust/npmtauri-plugins:check, and the Cargo matching version candidate may need fixing alongside build(deps): bump the tauri-deps group across 1 directory with 13 updates #1043.Merge-count optimization without diminishing merge protection
No blanket 11-PR series is required. Dependabot has already grouped #1043 and #1050. Use conditional compatibility-driven composites only for tightly related changes:
~2.12.0, Rust 1.77.2 gate intact; verify compatibility table first, testpnpm run tauri-plugins:checkand genuine packaged desktop CI before adopting a composite. If not feasible in bounded scope, split/hold the affected updates without distorting W1/Gate5.dependabot[bot]PRs; import compatible items only if train budget, ownership, scope, lockfile/changelog requirements and exact-head checks permit. Otherwise assign explicitCOMPATIBLE_NEXT_EPOCH/BLOCKED_MSRV/SUPERSEDED_CONFIRMEDoutcomes; never silently drop, reject/close or rubber-stamp every new PR. Freeze membership after a declared epoch so an unbounded bot stream cannot hold W1 hostage.Execution rules (binding): docs/DEPENDABOT-TRIAGE.md says NO Dependabot auto-merge, no blindly merged patches, one protected merge at a time, fully green PR suite (including advisory) + required CodeQL/security/reviewer census, followed by resulting-main full push CI before the next merge; genuine red main hard-stops the train. Signed maintainer commits, exact-head review and prior-change parity across Cargo/npm/workflows are required. No admin bypass, no preview/canonical alias or production promotion tricks. Normally Vercel SAFE retention is performed after each verified main merge unless an existing explicitly admitted Dependabot train batching policy allows a terminal once-per-train pass; always protect prod and preview aliases. No R-15 architecture/source scope on dependency composite. Respect ≤15 commits/≤3000 meaningful lines/≤30 files (and preferred smaller size). If any combo exceeds budget or needs unbounded review, use smaller successor(s) instead.
Acceptance: Publish a dated 11+ PR census with each original number, compatibility verdict, composite/single mapping, exact SHAs, full reviews/CI, resulting-main CI+CodeQL/Production/retention proof, precise close/merged/superseded state; no false claims all updates shipped if MSRV-conflicting PRs remain. Train is finite; promptly resume #359 / QNB-168 W1. The user's marketing, approved Cosmic Indigo and broad product work remain post-v1.30. This decision does not authorize merging today while #1041/#1042 are pending.
qnbs commentedon Oct 14, 2026
OVERRIDING MAINTAINER DECISION — 2026-10-14 ~13:14 CEST — 18 Dependabot PRs are POST-v1.30, not a pre-W1 train
Supersedes this issue's earlier pre-W1 Dependabot train directive and GH #1042's prior train sequence. Maintainer explicitly requested "Dependabot post release soll erstmal alles so weiterlaufen". Do not merge, group into a new PR, rebase, recreate, close or auto-merge routine Dependabot PRs before v1.30.0 VERIFIED; leave them open with normal bot intake and no artificial workflow cancellation. Authenticated intake now 18 OPEN Dependabot PRs #1043–#1060; main
a6ef4087270fb4ee014b73eae54bfefe33c3526bafter #1041 with resulting-main CI/CD + CodeQL SUCCESS. One-off proven release-blocking security risk can go through the existing exception/admission process before release; an update being newer does not by itself qualify.Existing #1028 Pages-only automatic pruning is already enabled, but manual
workflow_dispatchis read-only, no DELETE (run #38554851722 dry-run), next scheduled 2026-10-15 03:00Z writer opportunity. The maintainer also requests urgent immediate GitHub-Deployments UI reduction (143 reported, unverified exact count): GH #1042 now owns immediate, separately guarded GitHub API metadata cleanup of Vercel stale Preview records; do not wait for tomorrow's Pages schedule. Retain active Production, rollback and live Preview bindings; count 143 cannot be guaranteed to fall to single digits. If safe cleanup stalls on unprovable statuses, preserve them and resume R-15 W1 promptly instead of indefinite cleanup. Then Gate4→5→6→7→pre-tag truth→verified v1.30. No new workstreams or Source PRs for Dependabot now.The postrelease train is an existing #927/QNB-173 M8 P1 maintenance lane, after verified release: fresh bot-PR/graph inventory, immutable finite cohort, explicit MSRV/updater holds (#1043/#1045/#1047/#1056), parity checks, compatible bounded grouped integrations, independent reviews and full resulting-main gates between protected merges. Full maintained execution plan. Earlier comments are historical and do not authorize a pre-W1 train.
qnbs commentedon Oct 14, 2026
2026-10-14 ~13:35 UTC — W1 #1061 MERGED; resulting-main required Security Audit FAIL (new rustls advisories)
New live authority (supersedes any earlier W1 OPEN snapshot): W1 PR #1061 merged at 13:31:30 UTC into protected
main=52776ad5f390d2d674bd9d4810f8d8fd21ddf569from exact PR head1e3afb3adfabbc6347f73866891725c1a65ef635. All 41 PR-head check runs completed without a failure. New main push CodeQL 38572508623 SUCCESS, but CI/CD 38572508634 FAILURE: job🔒 Security Audit115881353687 and downstream required✅ CI Success115881675794 failed. This is not postmerge terminal.Exact OSV log evidence:
src-tauri/Cargo.lockresolvesrustls 0.23.45, with RUSTSEC-2026-0346 (CVSS 4.0), -0347 (2.3), -0348 (3.7), -0349 (3.7); scanner recommendsrustls 0.23.46, exits 1. Totals: 0 Critical / 0 High / 1 Medium / 3 Low. This is a real deterministic required security gate failure, not a transient test failure or authorization to suppress OSV. Upstream rustls 0.23.46 includes security fixes; test the smallest strictly scoped lockfile update compatible with existing Rust toolchain/MSRV and dependent platforms, not a general pre-release Dependabot train or broad Cargo updates. If incompatible, document the technical blocker and evaluate an equally narrow admissible alternative; no exemptions without established policy.Production ahead of qualification: Vercel
dpl_6o9bUdGhu2a8MJTuKtU2Fw1GcuHMis READY on exact new SHA, with the three canonical aliases mapped, authenticated canonical HTTP 200. That is runtime availability, NOT a successful CI/security/release gate. Do not mark W1 postmerge terminal, trigger ordinary #627 Active-mode retention for this newly failed epoch, admit Gate5, switch storage authority, or tag v1.30 while current-main required CI is red. Protect all current/rollback/preview deployments and evidence. There is also a postmerge CodeAnt nitpick about a Busy recovery event mapped toOk(None)inoperations.rs:476–480; independently classify as follow-up or valid contract defect, do not silently declare it fixed.Next smallest action: Claude local, obeying signing/hooks/PR policy, inspects exactly
rustlstransitive dependency and Rust/MSRV compatibility, produces the smallest necessary security-correction PR if needed, gets complete exact-head reviews/CI/CodeQL, merges through protected workflow only when admitted, and verifies a new resulting-main successful CI/CD+CodeQL before Vercel Active-mode SAFE retention and terminal receipt. Avoid a repeat of the unchanged failed job. #1042 GitHub metadata operator cleanup remains independent but destructive operations require their own preserved safety proofs; #1028 Pages cron is separate. Routine Dependabot #1043–#1060 stays POST-v1.30, except this proven narrow security/release exception.Gates remain:
GATE_4_TERMINAL=NO(W1 postmerge + remaining R1/I1/Q1/H1),GATE_5_IMPLEMENTATION_ADMITTED=NO,PRODUCTION_AUTHORITY_SWITCH_ALLOWED=NO,RELEASE_ALLOWED=NO.Actual admitted security exception now running — PR #1062 (2026-10-14 ~13:44 UTC)
The issue's earlier
rustlsfinding is now covered by PR #1062, OPEN/Ready head87047e49782ab73f5b629c9db871a7cd97d53df3against redmain=52776ad5f390d2d674bd9d4810f8d8fd21ddf569. Independent diff readback: one commit, two files only (src-tauri/Cargo.lockupdates onlyrustls 0.23.45 → 0.23.46and checksum; plusCHANGELOG.mdentry). No manifest or toolchain change; this is a narrow proven security blocker fix, not the pre-release Dependabot train.At check re-read: 37 registered; no failed;
🔒 Security AuditSUCCESS, CodeQL SUCCESS, CodeAnt Quality Gate PASS, Codex review completed, CodeScene approved and zero unresolved inline threads.🦀 Tauri Rust Gateand Node22/24 Quality Gates IN PROGRESS; not merge-authorized until all exact-head checks finish and complete current substantive reviewer disposition. Sourcery'sNeeds a human reviewerassessment is advisory and calls for a genuine source/impact assessment, not false auto-approval. Maintain signing/hooks, current PR review policy, no --admin/auto/bypass or unverified merge.Once exact-head admission is genuinely complete, follow the repository's standard protected merge process, verify resulting-main push CI/CD and CodeQL SUCCESS on its new SHA, Pages deploy and current production exact SHA / all three aliases + canonical HTTP 200, then run only a new SAFE Vercel platform preview-retention epoch and publish #627 receipt. Do not retroactively label red
52776ad5CI as SUCCESS; W1 source merge is fact, W1 postmerge terminal is still NO until recovered and remaining semantic review disposed.Keep #1042 independent: GitHub Deployment metadata safe pilot/batches require local authenticated status/inactive/DELETE and fresh mapping, not an unverified claim. #1028 first scheduled Pages writer remains 2026-10-15 03:00 UTC, distinct from #1042. Routine Dependabot #1043–1060 remains POST-v1.30 by maintainer override; this one patch is the documented genuine blocker exception.
This paragraph supersedes the prior prompt's statement that the fix PR had not yet been opened, but preserves its initial forensic OSV evidence.
Merge update 2026-10-14 ~14:15 UTC — #1062 MERGED; resulting-main requalification still RUNNING
This supersedes the preceding #1062 OPEN snapshot only. Security PR #1062 has MERGED at 14:09:07 UTC (reviewed head
87047e49782ab73f5b629c9db871a7cd97d53df3) into protectedmain=53dee55c161aff804e56ce5a73ffb94949f5df21, fixing the reportedrustlslockfile resolution. Exact new resulting-main CodeQL SAST #38577966012 is SUCCESS. Required CI/CD #38577966081 remains IN_PROGRESS; latest job readback: Security Audit SUCCESS, Tauri Rust + Node22/24 Quality Gates still in progress (no false all-green claim).Vercel Production
dpl_7oSLmN8gNLrpe56yJeT1UUZR2hBMREADY matches new exact main SHA, all three canonical aliases match and canonical HTTP 200 verified; this does not make postmerge CI terminal. Do not run the new W1/#1062 Active-mode Vercel platform retention until resulting-main required CI/CD and CodeQL are both SUCCESS; then check Pages actual publication/production+rollback and run only current epoch dry-run → SAFE reconcile → post-proof → #627 receipt. Earlier #1041 epoch stays terminal (do not repeat).#1042 remains a separate, incomplete Vercel-owned GitHub deployment record cleanup requiring Claude's fresh authenticated GitHub GET/status/Vercel checks and bounded verified pilot/batches, protecting Production/rollback/evidence/live Preview. No #1042 DELETE was performed by this checkpoint. #1028 first scheduled Pages-only writer is due 2026-10-15 03:00 UTC, its earlier manual success was read-only. Once postmerge terminal and bounded operator cleanup either safe-terminal or objectively blocked, continue Gate4 R1 → I1 → Q1 → H1 → Gate5/6/7 → release verification. Routine Dependabot 18 PRs remain post-v1.30.
GATE_4_TERMINAL=NO,GATE_5_IMPLEMENTATION_ADMITTED=NO,RELEASE_ALLOWED=NO.qnbs commentedon Oct 14, 2026
LIVE release-path / review-capacity checkpoint — 2026-10-14 23:06 UTC
Protected main
53dee55cremains exact-main CI/CD+CodeQL GREEN, Vercel production READY. Gate4 R1 PR #1063 remains OPEN/RFR at signed head16f0f1f6(14/15 commits, 26/26 inline threads resolved, latest 2 Node Quality Gates still IN_PROGRESS on exact SHA; final substantive Codex review not evidenced at latest SHA). Three latest Codex P2s fixed as a coherent correction at16f0f1f6; further cosmetic review cycles are undesirable at the hard budget. Normal protected merge and independent substantive security review criteria still apply; under quota exhaustion, markREVIEW_PENDING_QUOTA/NO_SIGNALrather than manufacture PASS or weaken branch rules. Continue nondestructive proof/planning while high-risk merge is blocked, rather than pause the full sprint for days.R1_TEST_ONLY_FOUNDATION!=R1_PRODUCTION_ENABLED: current Cargo-lock zero-dependents/test-support isolation prevents packaged reachability only in this repository graph, not future legitimate Gate5 production Cargo feature wiring. Known root/intermediate directory TOCTOU persists when test feature enabled; H1 handle-relative proof and R1 production enabler remain gating.GATE4_TERMINAL=NO,GATE5_ADMITTED=NO,PRODUCTION_AUTHORITY_SWITCH_ALLOWED=NO,RELEASE_ALLOWED=NO. Gate4 I1 must handle inherited-generation GC and stored-inventory 65,536-capacity concern; Q1-D1 remains pre-decided with separate source admission. Do not mistake a safe test-only merge for completion of all functional R1 acceptance.Ops: #1042 GitHub
vercel[bot]deployment metadata lacks documented safe delete pilot; #1028 scheduled Pages write first opportunity 2026-10-15 03:00Z (future at this note); #627 Vercel-platform retention for main53dee55cterminal, don't replay. Routine 18 Dependabot PRs remain POST-v1.30.0 VERIFIED per earlier supersession, never a pre-R1 train. Full current R-15 owner GH #359, QNB-145.