Skip to content

test(developer-experience): port eval cases S1 and S4 #9992

Closed as not planned
Closed as not planned

Description

@kyle-sexton

Refs: #6649

What to do

Port scenarios S1 and S4 from the committed sources into plugins/developer-experience/evals/<case>/ (prompt.md, case.yaml, graders/), deterministic graders where possible and llm graders calibrated against labeled samples. Carry the S4 #10 withhold rule check. Include the rm and compound-shell checks where a case needs them.

Done when

  • python3 plugins/evals/skills/validate/scripts/validate-cases.py plugins/developer-experience/evals exits 0.
  • git ls-files plugins/developer-experience/evals lists a case.yaml for both S1 and S4.
  • ci-status is green on the PR.

Split by the owner's HITL session (2026-10-24, owner decisions C12 and Q93-Q95). Intake triage sets its fields.

Activity

  1. added theissue type on Oct 25, 2026
  2. added
    needs-triageNot yet classified. Floor until a type and one priority tier are set.
    on Oct 25, 2026
  3. github-actions commented on Oct 25, 2026

    @github-actions
    Contributor

    Proposed work class: work-class: scoped
    Basis: automated intake triage; the lanes App applied this class.

    Size: Medium
    Complexity: Medium
    Uncertainty: Known
    Flags: none
    Blocked by: none

    Understood: port eval scenarios S1 and S4 into plugins/developer-experience/evals/ as case directories (prompt, case.yaml, graders), keeping the S4 #10 withhold check and the rm and compound-shell checks where needed. The done-when items are clear and checkable. No likely duplicates found among the open issues.

    Automated triage, applied by the lanes App.

  4. added
    priority: mediumReal value, no hard deadline; normal backlog flow.
    and removed
    needs-triageNot yet classified. Floor until a type and one priority tier are set.
    on Oct 25, 2026
  5. added
    status: readyTriaged, unblocked, and fully specified; eligible to pick up.
    work-class: scopedA briefed fix or small feature; blast radius bounded by the brief, tests exist.
    admission-deferredReady for the issue lane; work-unblock admits it when queued work is under the queued cap
    on Oct 25, 2026
  6. added
    agent-readyFully specified and briefed; eligible for autonomous pickup from the frontier.
    and removed
    admission-deferredReady for the issue lane; work-unblock admits it when queued work is under the queued cap
    on Oct 25, 2026
  7. kyle-sexton commented on Oct 25, 2026

    @kyle-sexton
    MemberAuthor

    Duplicate split of #6649 by a second Backlog HITL writer. To reopen: reopen this issue and say what the kept child misses.

    Kept child: #9953.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    agent-readyFully specified and briefed; eligible for autonomous pickup from the frontier.priority: mediumReal value, no hard deadline; normal backlog flow.status: readyTriaged, unblocked, and fully specified; eligible to pick up.work-class: scopedA briefed fix or small feature; blast radius bounded by the brief, tests exist.

    Type

    Fields

    No fields configured for Task.

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions