Summary

CI's build-test job took 261s. Two independent costs, both fixed:

Fixed per-package cost (CL-7417). Every package's migrations.test.ts / *.drizzle.test.ts imported scripts/e2e/harness.ts purely for e2eDatabaseUrl (to skip cleanly when DATABASE_URL is unset). harness.ts also imported @corbits/seeding and @corbits/workflows for two workflow-publishing helpers most of its consumers never call — pulling in @intx/types, @intx/hub-common, and @intx/agent, over a second of pure module-load cost paid by ~48 files whether or not the suite ever ran. Split the DATABASE_URL resolution into scripts/e2e/database-url.ts and the two heavy workflow-source helpers into scripts/e2e/workflow-source.ts; harness.ts no longer imports seeding/workflows at all. packages/bench's test time dropped from 3.33s to 0.12s in isolation; packages/longevity-sim from 2.89s to 1.4s.

Sequential package fan-out. scripts/run-all.ts forced the test script to concurrency 1, reasoning that suites spawn processes, bind sockets, and talk to Postgres and would flake under contention. Every suite that does any of that already isolates itself (OS-assigned ports, an explicit per-call dataDir, a scratch database, installDisposableHubDataDir()), and four consecutive full-concurrency local runs produced no failures, so the carve-out is dropped — test now resolves concurrency exactly like typecheck.

Shard the CI job too. A hosted runner's 4 vCPUs still capped the test step at ~115s even after both fixes above — the total CPU-seconds across every package's test script, divided by only 4 cores. scripts/run-all.ts now supports --shard i/n (round-robins the stably name-sorted package list across shards, no package dropped or run twice), and build-test in CI is now a 3-way matrix (build-test-shard) plus a build-test summary job that needs it, keeping the required check name unchanged.

Before / after

  • bun run test locally: 261s (old CI) -> ~44s wall, three consecutive clean runs.
  • CI build-test job: 261s -> 143s (single job, harness fix + concurrency only) -> sharded 3-way matrix, watched green on this PR.

Resolves CL-7484
Resolves CL-7417

Test plan

  • bun run typecheck
  • bun run lint
  • bun run test (three consecutive local runs, all green, ~44s each)
  • bun run check:structural
  • gh pr checks green on this PR (build-test-shard matrix + build-test summary)

run-all.test.ts still hard-coded the test script as the one script the
runner always caps at concurrency 1. Update its expectations first so
the next commit's removal of that carve-out lands against a red-then-
green suite rather than a change with no coverage of its own behavior.
Every DB-gated suite now resolves its own scratch database and every
e2e suite mkdtemps its own HUB_DATA_DIR and binds an OS-assigned port
(scripts/e2e/harness.ts's startHub/startSidecar/freePort), so nothing
left in the test phase depends on running one package at a time. The
test script now resolves concurrency exactly like typecheck: every
core in CI, cores minus two locally, or WORKBENCH_CHECK_CONCURRENCY
when set.
…ort chain

Every package's migrations.test.ts / *.drizzle.test.ts imported
scripts/e2e/harness.ts purely for e2eDatabaseUrl (to skip when
DATABASE_URL is unset). harness.ts also imports @corbits/seeding and
@corbits/workflows for pushWorkflowSource/workflowDeployBody, which
pulls in @intx/types, @intx/hub-common, and @intx/agent — over a
second of module-load cost paid on every build-test run of every one
of those packages, whether or not the suite ever executes.

Move the DATABASE_URL resolution (e2eDatabaseUrl, baseUrlToE2eUrl,
parseEnvFileDatabaseUrl, REPO_ROOT) into scripts/e2e/database-url.ts,
and the two workflow-source-publishing helpers into
scripts/e2e/workflow-source.ts. harness.ts re-exports the former for
its own heavier consumers and no longer imports seeding/workflows at
all. Update every DB-gated suite to import e2eDatabaseUrl from
database-url.ts directly, and the handful of full e2e suites (plus
longevity-sim's stack.ts) to import pushWorkflowSource/
workflowDeployBody from workflow-source.ts.
@linear-code

linear-code Bot commented Sep 6, 2026

Copy link
Copy Markdown

CL-7484

CL-7417

A hosted CI runner's fixed core count caps how much package fan-out
alone can cut build-test's wall time; the next commit lets the test
script split across a matrix of runners instead. Add its test
coverage first: --shard i/n partitions the stably name-sorted job list
with no package dropped or run twice, rejects a malformed shard spec,
and scripts/e2e/db-gate.test.ts covers the "build-test-shard"
GITHUB_JOB name the matrix job actually reports.
--shard i/n round-robins the workspace's stably name-sorted package
list across n shards and runs only shard i's assignment, so a script
run can be split across several CI runners instead of one. Add
"build-test-shard" next to "build-test" in dbGate's no-Postgres job
set, since that's the actual GITHUB_JOB name a sharded matrix run
carries.
A hosted GitHub Actions runner's 4 vCPUs meant scripts/run-all.ts's
own package-level concurrency alone couldn't cut build-test's test
step much past ~115s (its total CPU-seconds across every package's
test script divided by 4 cores). Splitting the same total work across
3 runners' worth of vCPUs is what actually buys more parallelism.

build-test-shard is now a 3-entry matrix, each running `bun run build`
and `scripts/run-all.ts test --shard <n>/3`; shard 1 also carries the
root-level scripts/*.test.ts suite, which only needs to run once.
build-test itself becomes a summary job that needs build-test-shard
and fails if any shard did, keeping the required check name every
branch protection rule and PR template names unchanged.
build-test is now a no-op summary job over the build-test-shard
matrix; the matrix job is the one that actually checks out the repo
with fetch-depth: 0 for tool-package-freshness's merge-base diff.
Running the test suite at full concurrency (this stack's earlier
commits) surfaced a genuine flake here: sweepIntervalMs=5 /
idleSleepMs=10 / a 15ms wait window assume the event loop keeps up
within single-digit milliseconds, which a CPU-contended CI runner
running many package test scripts at once cannot guarantee. Scale
every one of those constants up by 8x (5->40, 10->80, 15->120,
20->160) — same relative timing the tests already assert on, just
wide enough margins to tolerate tens of milliseconds of scheduler
jitter under load. idleSleepMs: 1_000 tests are unaffected; that
window was already generous.
@TheGreatAxios
TheGreatAxios merged commit 02ecf65 into main Sep 6, 2026
25 checks passed
@TheGreatAxios
TheGreatAxios deleted the cl-7484-build-test branch September 6, 2026 21:38
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant