Skip to content

Prepare the capstone release - #16

Merged
comwanga merged 1 commit into
mainfrom
agent/phase-11-release
Jul 27, 2026
Merged

Prepare the capstone release#16
comwanga merged 1 commit into
mainfrom
agent/phase-11-release

Conversation

@comwanga

@comwanga comwanga commented Jul 27, 2026

Copy link
Copy Markdown
Owner

What changed

  • Reframes BitScope around a learner-first home page, guided first-transaction journey, node readiness view, and clearer progressive navigation.
  • Adds the release documentation set: architecture, curriculum map, threat model, scenario authoring, proof bundles, migration notes, release notes, limitations, supported Core versions, and release-readiness checklist.
  • Replaces stale product captures with the six current learner/reviewer screenshots in both documentation trees.
  • Adds a deterministic Chrome capture-and-verification script and CI screenshot inventory/mirror verification.
  • Aligns the roadmap with the implemented Phases 0–11 and records CPFP/OP_RETURN as intentionally deferred follow-on work.

Why

This consolidates the completed capstone roadmap into a coherent first-run educational experience and makes the release artifacts reproducible. Documentation and screenshots now describe the current UI and the validated Bitcoin Core 28.1 workflow instead of older technical-console views.

Validation

  • Backend: 319 passed using an isolated pytest temp/cache directory.
  • Frontend: typecheck passed.
  • Frontend: lint passed with three existing non-blocking warnings.
  • Frontend: production build passed, including the new learner and node routes.
  • docker compose config --quiet passed.
  • scripts/capture-screenshots.ps1 -VerifyExisting passed.
  • All six screenshots are 1440×1000 and byte-identical between docs/screenshots and docs-site/screenshots.
  • No stale screenshot filenames or unresolved local documentation image references remain.
  • git diff --check passed.

@comwanga
comwanga marked this pull request as ready for review July 27, 2026 01:30
@comwanga
comwanga merged commit 4304702 into main Jul 27, 2026
6 checks passed
@comwanga
comwanga deleted the agent/phase-11-release branch July 27, 2026 01:31
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant