Repository navigation
Compare Nanite Control Facility armor repair to a disabled control - #180
Open
viktor-ferenczi wants to merge 6 commits into
Open
viktor-ferenczi wants to merge 6 commits into
viktor-ferenczi wants to merge 6 commits into
Conversation
…ometWorks/cluster into codex/se1845-nanite-repair
…into codex/se1845-nanite-repair
…into codex/se1845-nanite-repair
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Exercises the repair feature in Nanite Control Facility v2.2(13), Workshop 219757726. Two powered stations 2 km apart carry identical facilities, steel plates and a remote control. Both armor targets sit beyond the factory block's 4 m native tool radius. Both facilities stay disabled until after the measured damage. The fixture then enables one.
Both servers restored the 300 integrity in 1,050 simulation frames (17.5 simulation seconds). Their facility terminals each reported one current construction target, a 26 MW stream and the fixture's configured one-second minimum travel time. Linux, Polaris, cluster 0.3.32. The full comparison took 138.8 seconds and recorded hashes for 52 Workshop C# sources.
A separate standalone control removed the ship controller from both grids. Its enabled factory had power but reached no target in 76 seconds. The mod looks up a grid's power distributor through a ship controller. This case covers same-grid repair in creative mode. Mining, projection, grinding and beacon-mediated remote repair need separate cases. SE-1845