Skip to content

5.3.0-M1-release-notes (#5633) #608

5.3.0-M1-release-notes (#5633)

5.3.0-M1-release-notes (#5633) #608

Triggered via push December 22, 2025 13:11
Status Failure
Total duration 29m 22s
Artifacts

main-status.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

22 errors
build (17)
Resource not accessible by integration - https://docs.github.com/rest/checks/runs#create-a-check-run
build (17)
Sail is shutdown
build (17)
Connection has been closed
build (17)
Connection has been closed
build (17)
Connection has been closed
build (17)
java.lang.InterruptedException
build (17)
java.lang.InterruptedException
build (17)
java.lang.InterruptedException
build (17)
java.lang.InterruptedException
build (17)
java.lang.InterruptedException
build (17)
java.lang.InterruptedException
build (11)
The strategy configuration was canceled because "build._17" failed
build (11)
java.lang.InterruptedException
build (11)
java.lang.InterruptedException
build (11)
java.lang.InterruptedException
build (11)
java.lang.InterruptedException
build (11)
java.lang.InterruptedException
build (11)
java.lang.InterruptedException
build (11)
Connection has been closed
build (11)
java.lang.InterruptedException
build (11)
java.lang.InterruptedException
build (11)
Connection has been closed