Skip to content

fix main status (#5546) #585

fix main status (#5546)

fix main status (#5546) #585

Triggered via push November 2, 2025 11:27
Status Failure
Total duration 29m 32s
Artifacts

main-status.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

22 errors
build (24)
Resource not accessible by integration - https://docs.github.com/rest/checks/runs#create-a-check-run
build (24)
java.lang.InterruptedException
build (24)
Connection is closed
build (24)
java.lang.InterruptedException
build (24)
Connection has been closed
build (24)
java.lang.InterruptedException
build (24)
Connection has been closed
build (24)
java.lang.InterruptedException
build (24)
java.lang.InterruptedException
build (24)
java.lang.InterruptedException
build (24)
java.lang.InterruptedException
build (11)
The strategy configuration was canceled because "build._24" failed
build (11)
Connection is closed
build (11)
Sail is shutdown
build (11)
Connection has been closed
build (11)
Connection has been closed
build (11)
java.lang.InterruptedException
build (11)
java.lang.InterruptedException
build (11)
java.lang.InterruptedException
build (11)
java.lang.InterruptedException
build (11)
java.lang.InterruptedException
build (11)
java.lang.InterruptedException