Asset Validation Report
Overall assessment: Needs revision
Gate status: FAIL
Generated (UTC): 2026-08-02T18:56:37.151567+00:00
Prepared records
- wind: 10
- solar: 3
- tpp: 38
- hydro_generation: 118
- hydro_reservoirs: 21
- hydro_cascade: 76
Checks performed
| Check |
Severity |
Status |
Findings |
Denominator |
Interpretation |
| wind_required_columns |
ERROR |
PASS |
0 |
7 |
Every required asset field must be present. |
| solar_required_columns |
ERROR |
PASS |
0 |
6 |
Every required asset field must be present. |
| tpp_required_columns |
ERROR |
PASS |
0 |
6 |
Every required asset field must be present. |
| hydro_generation_required_columns |
ERROR |
PASS |
0 |
10 |
Every required asset field must be present. |
| hydro_reservoirs_required_columns |
ERROR |
PASS |
0 |
5 |
Every required asset field must be present. |
| hydro_cascade_required_columns |
ERROR |
PASS |
0 |
7 |
Every required asset field must be present. |
| asset_identifier_integrity |
ERROR |
PASS |
0 |
266 |
Identifiers must be populated and unique within each table. |
| asset_coordinates |
ERROR |
PASS |
0 |
266 |
Coordinates must be numeric and inside the broad modelling envelope. |
| positive_asset_capacities |
ERROR |
PASS |
0 |
266 |
Generation capacity and known reservoir storage must be positive. |
| capacity_evidence_warnings |
WARNING |
WARN |
2 |
21 |
Missing reservoir storage remains visible pending an evidence policy. |
| technology_vocabulary |
ERROR |
PASS |
0 |
245 |
Technology labels must use the declared Rule 2 vocabulary. |
| base_network_mapping |
ERROR |
FAIL |
1 |
245 |
Every generating asset must resolve to at least one Rule 1 bus. |
| wind_turbine_model_coverage |
ERROR |
PASS |
0 |
10 |
Every wind configuration must resolve through the turbine dictionary. |
| hydro_reservoir_references |
ERROR |
PASS |
0 |
118 |
Internal reservoir references must resolve; named river sinks are external boundaries. |
Blocking checks
Warning checks
capacity_evidence_warnings
Evidence artifacts
schema_issues.csv
duplicate_identifiers.csv
invalid_coordinates.csv
invalid_capacities.csv
invalid_technology_labels.csv
unmapped_network_nodes.csv
wind_turbine_coverage.csv
hydro_reference_issues.csv
Required caveats
- The coordinate check uses a broad bounding box, not an administrative polygon.
- A bus mapping proves identifier compatibility, not electrical feasibility.
- Capacity checks establish structural plausibility, not authoritative nameplate values.
- External river sinks are accepted boundaries and are not reservoir assets.
Asset Validation Report
Overall assessment: Needs revision
Gate status: FAIL
Generated (UTC): 2026-08-02T18:56:37.151567+00:00
Prepared records
Checks performed
Blocking checks
base_network_mappingWarning checks
capacity_evidence_warningsEvidence artifacts
schema_issues.csvduplicate_identifiers.csvinvalid_coordinates.csvinvalid_capacities.csvinvalid_technology_labels.csvunmapped_network_nodes.csvwind_turbine_coverage.csvhydro_reference_issues.csvRequired caveats